News  Details

22/09/10

Téloché: New construction contract in Sarthe

Among 8 candidates, NDEI won the call for tender in order to build the new water-treatment plant. The proposal was accepted thanks to a high quality draft and a very well-kept landscaped integration, limiting the visual impact of the plant toward local residents and sports facilities (stadium, boules ground, fitness trail).
Realized with Bézy SAS as the civil engineering partner, the building will begin at the end of year 2010.
Designed to receive 2400 IE sewage, the reliable and proven technology will guarantee the protection of the receiving environment (high nitrogen and phosphor removal efficiency). Moreover, a tank stores stormwater runoff to improve the waste stream quality.
The sludges accumulated in the wastewater treatment process are thickened then stored before spreading.

Go back